How the cost ranges are built
Every cost table on this site follows the method below. If a table departs from it, the table says how.
What a table shows
Each table in the cost data library covers one job or purchase and shows:
- Low, typical and high. Three figures for each line, not a single average.
- The unit. For example per installed unit, per roofing square or per hour, so the figure can be scaled to a house of any size.
- A region note. Whether the figures are national or drawn from particular regions.
- An as-of date. The date the figures were last checked against their sources.
- The sources. At least three, each with a link and the date it was read.
Where the figures come from
Sources fall into three groups, used in this order of preference.
- Primary published sources. Government agencies, university extension services, and manufacturer price lists and product documents.
- Quotes gathered by the editor. Real quotes from contractors and suppliers for a described job. At least two quotes count together as one source. They are labelled as quotes in the source list, and nothing that identifies a customer is published.
- Published trade and industry data. Cost surveys and trade association figures, named in the source list.
Figures are never copied from another website's cost page.
How low, typical and high are set
The sources for a line rarely agree exactly, and they should not be expected to, because they describe different regions, years and job conditions. The low figure is the lowest value that any source reports for a standard version of the job. The high figure is the highest value reported for a standard version of the job. Unusual conditions, such as emergency call-outs or major structural repair found during the work, are left out of the range and described in the article text instead. The typical figure is the point the sources cluster around. When a source gives its own average or median, that figure is used for the comparison.
When sources are from different years, the table says which year each belongs to. Figures are not adjusted for inflation unless the table states the adjustment and its source.
When data is limited
If only one or two sources exist for a job, the range is still published, with a limited-data note on the table. A thin range with an honest label is more useful than a confident number with nothing behind it.
Review cycle
Every table is reviewed at least once every 6 months. At review, each source is read again, dead links are replaced, and the figures and the as-of date are updated. A table is reviewed sooner if a reader reports a problem or if a rule change, such as a new efficiency standard, alters what can be installed.
What the ranges are not
The ranges are planning estimates. They are not quotes and not a promise of what any contractor will charge. Local labor rates, access to the work area, permit fees and the condition of the existing installation all move a real price. Use the ranges to judge whether a quote is ordinary, and get more than one quote for any large job.
Calculators
The calculators on this site follow the same approach. Each one shows its formula, lists every assumption with the source of each constant, and gives a worked example, so the result can be checked by hand.
Report a problem
If a figure looks wrong or a source has moved, please tell us. The editorial standards explain how corrections are handled.